Vane & Ridge Roofing Co.

Roofing · Jacksonville, Florida

Every layer, in order.Deck to ridge cap.

We re-roof houses on the First Coast and we build them the way the assembly is meant to go together, one layer at a time, with the fasteners and flashing you never see doing most of the work.

Book a roof inspection

Storm damage, same day

(904) 555-0142

Duval, Clay, St. Johns and Nassau counties

Architectural shingleStanding-seam metalConcrete tileClay barrel tileLow-slope membraneStorm repairSkylightsGutter & fascia

Who we are

A roof is one system, and it fails at the joins.

Almost every leak we get called out to started somewhere other than the shingles. A pipe boot that went brittle. A chimney counter-flashing that was caulked to the brick instead of let into the mortar joint. A valley where two roof planes meet and somebody ran the metal short. The covering gets replaced every twenty years and the details underneath it get reused, which is why a new roof over old flashing leaks in the same place the old one did.

We work the other way around. Everything above the deck comes off, every penetration gets a new flashing, and the covering goes on last. It costs more in labour on day one and it is the reason we can put ten years on the workmanship.

What a re-roof actually is

Layer one

The part you will never see holds the rest of it down.

We pull the old covering to bare deck and walk every sheet. Soft plywood comes off. Sound sheathing gets re-nailed to the current schedule, 8d ring-shank at 6 inches on centre through the field, because the fastening is what carries uplift into the trusses. Nothing goes back on until the deck passes.

Layer two

Water finds the seams, so we build the seams first.

Self-adhered underlayment across the whole deck, not a felt run with taped laps. Valleys get an open metal W, ice-and-water on both sides. Every wall gets step flashing woven into the courses, and every pipe gets a new boot. Old flashing is where almost every leak we chase actually started.

Layer three

Then the roof you can see goes on, course by course.

Starter at the eave, six nails per shingle in the high-wind pattern, courses racked straight off a chalk line. Hip and ridge caps last, over a vented ridge that lets the attic breathe. It is the only layer anyone looks at and the last one we touch.

How a job runs

Inspection

We get on the roof before we quote it.

No drone flyover, no satellite measurement, no number over the phone. Someone walks the slopes, opens the attic, and photographs what they find. You get the report whether or not you hire us.

Scope

One estimate, itemised, with the exclusions written down.

Squares, underlayment class, flashing, decking allowance, permit, disposal. The sheathing allowance is the line most estimates leave off, and it is the line that turns into a change order on day two, so ours states a per-sheet price up front.

Permit

Product approvals and the permit go in before the material does.

Every component we install carries a Florida product approval number, and those numbers go on the permit application. We schedule the dry-in inspection with the tear-off, so the deck is never sitting open waiting on an inspector.

Install

One crew, start to finish, and the same lead every day.

You get the lead's phone number on day one. Magnet sweep of the drive and the beds every evening, dumpster on plywood, and no material stacked against the house overnight.

Warranty

The paperwork lands before we invoice the balance.

Final inspection card, the manufacturer warranty registered in your name, our workmanship warranty, and the photo record of the deck before it was covered. That last one matters when you sell the house.

Selected work

Five roofs, and what was actually wrong with them.

All projects →

The difference

Compare us to whoever else is in the driveway.

Vane & Ridge

Local, licensed, one crew

Storm-chase crews

Alternative

How it gets quoted

What happens before you see a number

We walk it, open the attic and photograph it. You keep the report either way.

Ladder to the eave, or a drone. Quote written in the driveway.

Who is on the roof

The crew, and who they answer to

One crew, one lead, the same phone number from tear-off to final inspection.

Subcontracted crew, often a different one than the salesperson described.

Rotten decking

The line most estimates leave off

Stated per-sheet before we start, so bad decking is never a change order.

Discovered on day two, priced on day two.

Permit & approvals

Whose name is on the application

Pulled in our name, with product approvals attached, before material is ordered.

Sometimes pulled under a borrowed local licence.

The warranty

Who is standing behind the work

Ten years on our workmanship, plus the manufacturer warranty registered for you.

A warranty from an entity that may not file in this state next year.

In three years

When you find a stain on the ceiling

We answer. We are three miles from the job and we are here next season.

The number goes to a call centre once the season moves on.

Years on the First Coast
17Years on the First Coast
Roofs replaced since 2009
2,400+Roofs replaced since 2009
Counties we actually cover
4Counties we actually cover
Workmanship warranty, in writing
10yrWorkmanship warranty, in writing
Three roofers told me the ceiling stain was a pipe boot. Vane & Ridge opened the attic, found the chimney counter-flashing had never been let into the mortar joint, and showed me the photograph before they quoted anything.
Written for this demonstrationVane & Ridge is a fictional company

Questions we get

The things people ask on the driveway.

Before the work

How long does a roof estimate take?

About an hour on site, and you have the written estimate within two business days. We do not quote from satellite imagery, so someone has to get on the roof and into the attic first.

Do you charge for the inspection?

No, and you keep the report and the photographs whether you hire us or not. If you are getting other quotes, the report is useful for comparing them line to line.

Can you tell me what it costs over the phone?

We can give you a range for a roof of that size and covering. We will not give you a price, because the number that matters depends on what the deck looks like and how many penetrations the roof has, and neither is visible from the ground.

During the work

Do we need to move out?

No. It is loud, and it will rain debris in the attic, so cover anything stored up there. Park on the street rather than the drive so the dumpster and the material truck can work.

What happens if it rains mid-job?

We never open more deck than we can dry in the same day. If a system comes through, the exposed area is already under self-adhered underlayment, which is a watertight roof on its own for weeks.

What about the nails in the yard?

Magnet sweep of the drive, the walks and the beds every evening, and again on the last day. Some still turn up. Call us and we come back out with the magnet.

After the work

What does the warranty actually cover?

Two separate things. The manufacturer covers the material and we register it in your name. We cover the workmanship for ten years, which is the part that fails when a roof is installed badly.

Does the warranty transfer if we sell?

The manufacturer warranty transfers once, within the first years of the term, and there is a form. Ours transfers with the house. Tell your closing agent to ask us for the letter.

Will my insurance premium change?

Often, yes. Ask your carrier about a wind mitigation inspection after the roof is finished. A new covering with the current fastening schedule and a documented roof-to-wall connection is the credit most carriers price on.

Next step

Get on the roof before you get a number.

We walk the slopes, open the attic and photograph what we find. The report is yours whether or not you hire us, and it is the only way to compare two estimates line to line.

Duval, Clay, St. Johns and Nassau counties · Monday to Friday, 7am to 5pm