Vane & Ridge Roofing Co.

Work

A new roof designed around the solar that came later

The array was eighteen months away. We set the seam spacing for it anyway, so the installer never had to touch the water plane.

Roof area
44 squares
Pan width
16 inches, set to rail spacing
Penetrations
One, flashed by us
On site
9 working days

The problem

The owners knew they wanted solar and did not want it yet. On most roofs that means an installer arrives later and drills a few hundred penetrations through a perfectly good covering, and the roof warranty quietly stops meaning anything.

What we did

Standing seam at a 16-inch pan, laid out so the seams line up with the array's rail spacing. Solar rails clamp to the seam. Nothing penetrates the panel, the roofing warranty survives the array, and the panels can come off in thirty years without a mark on the metal.

The detail

We ran the conduit chase and the roof penetration for the inverter during the roofing, under our own flashing, with a capped stub left on the deck. The solar crew connected to something that was already watertight instead of making a new hole in a finished roof.

Next step

Get on the roof before you get a number.

We walk the slopes, open the attic and photograph what we find. The report is yours whether or not you hire us, and it is the only way to compare two estimates line to line.

Duval, Clay, St. Johns and Nassau counties · Monday to Friday, 7am to 5pm