
Piers and docks
New piers and docks on driven pilings, framed for the water in front of your property rather than to a catalogue drawing.
Deltaville, Virginia
Piers, bulkheads, boat lifts and riprap on the Piankatank, the Rappahannock and the Chesapeake. Call Michael and he will come look at your shoreline.
What we build
This is the whole list. If what you need is not on it, call and ask rather than guessing.

New piers and docks on driven pilings, framed for the water in front of your property rather than to a catalogue drawing.

Vinyl sheet pile bulkheads with timber walers and pilings, for a bank that is washing out from under the lawn.

Boat lifts supplied and set, sized to the boat and to the slip it has to sit in.

Graded stone set against the bank so the wave breaks on rock instead of on your shoreline.

Commercial marina work. At Urbanna Marina that meant a bulkhead, the travel lift well and the walkway.

Fill dirt and sand delivered and placed, usually as the last step of a bulkhead or shoreline job.
Permits
Virginia runs one Joint Permit Application, and it lands on four desks at once: the Middlesex County Wetlands Board, the Marine Resources Commission, DEQ, and the Army Corps of Engineers in Norfolk. Each one decides on its own.
Since 1 September 2025 the Corps has been the central point of receipt for the whole Commonwealth, and the Regulatory Request System is the only way to file. A good many people are still working from the old instructions.
What we tell people is that we can provide assistance with the permit process. Virginia and the Corps both allow a contractor to prepare and file the application as the owner's authorized agent, on a signed authorization. How much of it we take on depends on the job, so call and ask about yours.
VMRC aims to process simple projects in 45 to 60 days, and more involved ones in 60 to 90.
Recent work
Every photograph on this page came off one of our own jobs. None of it is stock.
Who you are hiring
Meredith Marine Construction is a Deltaville company, owned and run by Michael Meredith. The Commonwealth issued his Class A contractor licence, number 2705169878, in December 2018. It carries no disciplinary action and no open complaints.
The specialty on that licence is Highway and Heavy, which is the civil-construction rank rather than the residential one most dock builders hold. Urbanna Marina is what that looks like on the water: a bulkhead, a travel lift well and a walkway, on a working commercial marina.
The barge in these photographs is ours, and so is the excavator sitting on it.
Where we work
We work the Middlesex County waterfront, mainly between Deltaville and Topping, on the Piankatank, the Rappahannock and the lower Chesapeake Bay. Call if your property sits outside that and we will tell you straight whether we can get to it.
We have also worked at Urbanna Marina, on the bulkhead, the travel lift well and the walkway.
Very Honest Company that does Great Work
Before you call
You need to file either way, but often not to hold a VMRC permit at the end of it. Virginia exempts a noncommercial private pier built by the waterfront owner, as long as it stays inside the navigation line, the pier is no wider than six feet, finger piers no wider than five, any L or T head plus floating platforms come to 400 square feet or less, and VMRC finds it is not a hazard to navigation.
The catch sits in the statute itself. The exemption applies after an application has gone to the Commission for review, so the paperwork still goes in. What comes back is a determination that no permit is required, rather than a permit. Anyone telling you a private pier means no paperwork is reading it wrong. Va. Code § 28.2-1203(A)(5)
One application that reaches four reviewers at the same time: your local wetlands board, the Virginia Marine Resources Commission, the Department of Environmental Quality, and the Army Corps of Engineers. It saves you filing four times. It does not merge the four decisions, and any one of them can come back with questions.
Since 1 September 2025 the Corps receives every Virginia request, and the Regulatory Request System at rrs.usace.army.mil is the only route in.
We can provide assistance with the permit process. What that covers depends on the job, so the honest answer is to call Michael and ask about yours rather than to promise you a blanket yes on a web page.
What is fixed is the mechanism. Virginia and the Corps both allow a contractor to prepare and file the Joint Permit Application as the property owner's authorized agent, on an authorization you sign. The application stays in your name either way, because the Commonwealth requires the riparian owner to be the applicant.
VMRC publishes a target rather than a promise: 45 to 60 days for simple projects, 60 to 90 for more complicated ones.
Your local wetlands board runs on a clock set in law. It has to hold a public hearing within 60 days of receiving a complete application, and decide within 30 days of that hearing. If it misses those, the application is deemed approved. The Middlesex board meets on the second Tuesday of the month, at ten in the morning, in Saluda. Va. Code § 28.2-1302
The Corps does not publish a target for this kind of work, so we will not invent one for you.
Virginia law now starts from living shorelines. The Commission may permit only a living shoreline approach unless the best available science shows one will not suit that site, and even where it does not suit, living shoreline elements have to be worked into the design as far as possible.
That does not ban a bulkhead. It puts the burden on you to show a living shoreline will not hold that particular bank. Rock sits in an easier place: stone is named in the statute, and riprap can qualify as a living shoreline component under an expedited general permit, where a hardened vertical bulkhead cannot. Which way your shoreline should go depends on how much energy it takes and what is behind it, and that is a conversation to have standing on it. Va. Code § 28.2-104.1
The Commonwealth charges a $100 processing fee with the application. If the project uses state-owned bottomland, the permit issuance fee is $100 where the project costs under $10,000, $300 between $10,000 and $500,000, and $600 above that. Va. Code § 28.2-1206
Middlesex County charges its own wetlands and Chesapeake Bay Preservation Area fees on top. They are published on the county website and they move, so check them rather than budgeting off this page.
Mainly between Deltaville and Topping, on the Middlesex County waterfront. We have also worked commercially at Urbanna Marina, on the bulkhead, the travel lift well and the walkway.
If your property sits outside that, call and ask. We will tell you straight whether we can get to it.
Call Michael on (804) 307-1502, Monday to Friday between 8:00 and 5:30, and he will come and look at the shoreline. If it is easier to write it down, use the form above.
Get in touch
Call Michael and he will come and look at the shoreline. There is no form to fill in.
16575 General Puller Hwy
Deltaville, VA 23043
Monday to Friday, 8:00 AM to 5:30 PM
Closed Saturday and Sunday
Virginia Class A contractor 2705169878
Highway and Heavy specialty